Accomplishment and activities that I took part in:
It’s hard to believe that it’s been a year since being sworn into office. As the calendar advances into 2025 I look forward to building on the successes of 2024.
I’m committed to responding to resident’s concerns.
Ward Rounding- throughout my tenure on council I’ve conducted monthly rounding of every street in the Ward on foot, bike or in a car. This rounding has helped identify issues in Ward One.
I’ve reported street lights out, water leaks, signage concerns, sidewalk/pavement issues and other mare to appropriate departments within the city. Some of these issues have been resolved and others are ongoing. I’ll continued to follow up to ensure issues are solved and remain committed to continuing the rounding practice. Ward One Resource Day.
During 2024 I was assigned to the Board of Building Zoning and Appeals, Public Works Committee and Safety Committee. To get acclimated as a new member of city council addition to my assigned committees I also attended at least one meeting of every Board, Commission or Committee in 2024 I also met with every department head and many of their staff. For 2025 I’m assigned to the Parks and Recreation Commission, Public Works Committee and the Finance Committee.
Looking forward:
Board and Commission Openings:
BOARD OF ZONING APPEALS – THREE OPENINGS- WARDS 1, 4 & 5
CAPITAL IMPROVEMENT BOARD – WARDS 1, 2 & 5
ENVIRONMENTAL COMMISSION – FOUR OPENINGS
JEDI COMMISSION –THREE OPENINGS
PARKS AND RECREATION COMMISSION – WARDS 1, 2 & AT-LARGE
PLANNING COMMISSION – WARDS 1 & 2
Application Deadline
Applications must be received by Monday, February 10, 2025 by 4:30 pm to be considered.
Link to apply:
https://mytwinsburg.com/FormCenter/Boards-Commissions-4/Board-Commissions-Applications-2025-127
Snow Removal:
To ensure safe travel, the City prioritizes plowing main roads, bridges, hills, and secondary main roads. These areas must be kept passable to maintain a reliable transportation network. Once these key routes are cleared residential side streets are addressed.
While snow left in driveway aprons can be frustrating result of keeping roads clear for everyone, snow should not be pushed, shoveled or blown from private property onto public streets.
Senior Driveways
Driveways for residents enrolled in the Senior Snowplow Program are plowed when snow accumulation reaches approximately 3 inches or more. Streets and highways throughout the City are prioritized before senior driveways are plowed. Additionally, snowplowing under this program is limited to one visit per 24-hour period. For more information about this service, please contact the Snowplow Hotline at 330-963-8703.
Infrastructure updates:
Indoor Pool:
The indoor pool will not be available May of 2025-September 2025 due to a pool pack project.
Fitness Center PoolPak Project | City of Twinsburg, Ohio
Ravenna/Shepard/Broadway/Richmond Intersection Improvement:
The project is anticipated to begin in 2025. A minimum of one lane of traffic in each direction for all roads will be maintained during the duration of construction and local access for abutting properties and adjacent streets will be maintained at all times. Construction and lane restrictions will be posted prior to the start of construction.
Ravenna/Shepard/Broadway/Richmond Intersection Improvement | City of Twinsburg, Ohio
Sewer Improvement:
Parallel Waste Water Line improvements between Glenwood Dr and Center Valley Park is complete.
E. Idlewood Pedestrian Bridge
The bridge is installed as well as a new ADA compliant playground at Center Valley park. Thanks for your understanding and patience as both of these projects were underway.
If you have any questions or concerns the best way to connect is:
Cell: 234-293-9806
Email: cbonacci@twinsburg.oh.us